bye bye basement

After a few adjustments and framings, a floor was began:



No more words needed....


Presto, half of the main floor is finished.

I bet you could watch that animation all night and find all sorts of interesting details. Just watch the glue bottles disappear one bottle at a time. (bottom left)

Tuesday, March 18, 2008

Cranes and Things

Setting the floor trusses:



Checking the plans before continuing....

Finito!



Crane handling the trusses:


Today included the general fastening around the trusses... leveling, lining, nailing, securing, ect.

If weather permits, perhaps some floor sheets will be installed tomorrow.

Labels: , ,

Friday, March 14, 2008

Basement walls

The rest of this week was spent building the main basement walls. (outer, and middle mainframe
Applying the OSB plywood before lifting wall:

continuing...

Wednesday morning we had a few visitors (other than the usual Turkeys):

Building the basement garage door frame:

outer walls complete (aside from a few pieces of OSB):


DO NOT TRY THIS AT HOME

Building the middle wall:


Today we received the floor trusses, which will be hoisted via crane and installed on Monday.

Unloading the trusses:


Monday, March 10, 2008

Begin: Framing

Last week's lack of postings was due to the weather, the concrete pouring and my hiatus to neighboring cities.

Here's what happened:
We built the form for the porch steps foundation:

Concrete poured:



This week began the wood framing work. First we received some of the lumber:


Beginning the wall building for the outer basement walls:


Marking the lower and upper 2x4's for stud/jack placement: (the lower is treated)

First segment is stood up and set into place:

Other segments are added:

Finished for the day!